Job Management Partner 1/Integrated Management - Event Gateway for Network Node Manager i Description, User's Guide and Reference

[Contents][Glossary][Index][Back][Next]


6.2.2 Changing the settings of the host on which JP1/IM - EG for NNMi is running

This subsection describes the procedures for changing the settings of the host on which JP1/IM - EG for NNMi is running.

For details about how to change the JP1/Base settings, see the Job Management Partner 1/Base User's Guide.

Organization of this subsection
(1) Procedure for changing the host name, IP address, or port number
(2) Procedure for editing the hosts file and jp1hosts definition file
(3) Procedures for changing the system date and time

(1) Procedure for changing the host name, IP address, or port number

To change the host name, IP address, or port number:

  1. Terminate JP1/IM - EG for NNMi.
  2. Change the host name, IP address, or port number, as necessary.
  3. Restart JP1/IM - EG for NNMi.

(2) Procedure for editing the hosts file and jp1hosts definition file

This subsection describes how to change the host information specified in the hosts file or jp1hosts definition file while JP1/IM - EG for NNMi is running.

Changing information of a host on which JP1/IM - EG for NNMi is installed
After you have changed the host information, restart JP1/IM - EG for NNMi.

Adding or changing information of a host on which JP1/IM - EG for NNMi is not installed
If you have added or changed host information, you must either restart JP1/IM - EG for NNMi or execute the jegn_spmd_reload command to reload the new settings. For details about the jegn_spmd_reload command, see jegn_spmd_reload in 7. Commands.

(3) Procedures for changing the system date and time

This subsection describes the procedures for changing the system date and time.

Setting the system date and time to an earlier time
Avoid changing the system date and time to an earlier time. If you do so, JP1 events might not be issued or duplicate JP1 events might be issued.

To set the system date and time to an earlier time:

  1. Terminate JP1/IM - EG for NNMi.
  2. Set the system date and time.
  3. Keep JP1/IM - EG for NNMi stopped until the system date and time that was in effect before the change is reached (until the date and time at which step 2 was performed).
  4. Start JP1/IM - EG for NNMi.

Advancing the system date and time to a point in the future

To advance the system date and time to a point in the future:

  1. Terminate JP1/IM - EG for NNMi.
  2. Set the system date and time.
  3. Start JP1/IM - EG for NNMi.

[Contents][Back][Next]


[Trademarks]

All Rights Reserved. Copyright (C) 2009, Hitachi, Ltd.