Job Management Partner 1/Integrated Management - Event Gateway for Network Node Manager i Description, User's Guide and Reference
This section describes how to terminate JP1/IM - EG for NNMi. You must terminate the JP1/IM - EG for NNMi services before you terminate the JP1/Base services.
- Automatic termination in a cluster system
- For details about terminating JP1/IM - EG for NNMi automatically in a cluster system, see 3.3 Registering into the cluster software.
The termination method depends on the OS.
- Organization of this section
- 5.2.1 In Windows
- 5.2.2 In UNIX
All Rights Reserved. Copyright (C) 2009, Hitachi, Ltd.