3.2 Tasks required to build a disaster recovery system

This section explains the tasks required to build a disaster recovery system.

Organization of this section
3.2.1 Building the RAID Manager environment
3.2.2 Building the HiRDB environment at the main site
3.2.3 Checking the HiRDB configuration at the main site
3.2.4 Taking control over the paired logical volume groups (transfer control from the main site to the remote site)
3.2.5 Checking the status of paired logical volume groups at the remote site
3.2.6 Building the HiRDB environment at the remote site
3.2.7 Checking the HiRDB configuration at the remote site
3.2.8 Taking control over the paired logical volume groups (transfer control from the remote site to the main site)
3.2.9 Checking the status of the paired logical volume groups at the main site