Nonstop Database, HiRDB Version 9 System Operation Guide
The following table lists criteria helpful for deciding which system switchover facility to use.
Table 26-9 System switchover facility application criteria
Importance | Standby system switchover facility | Standby-less system switchover (1:1) facility | Standby-less system switchover (effects distributed) facility |
---|---|---|---|
Transaction performance | Excellent | Poor | Good |
|
|
|
|
Resource requiremen | Poor | Excellent | Excellent |
Needs standby server machines or system resources for standby system units. | Does not need standby server machines or system resources for standby system units. | Does not need standby server machines or system resources for standby system units. | |
Handling of a series of errors | Excellent | Poor | Excellent |
Can handle a series of errors based on linkage with cluster software (only when IP addresses are inherited, and not when the rapid system switchover facility is used). | Cannot handle a series of errors because there is only one fixed alternate server. | Can handle a series of errors based on linkage with cluster software. |
The following table indicates whether each system switchover facility can be used when another system switchover facility is already being used for another unit in the same system.
Table 26-10 Usability of each system switchover facility when another system switchover facility is already being used for another unit in the same system
Facility already being used | Usability of the standby system switchover facility | Usability of the standby-less system switchover (1:1) facility | Usability of the standby-less system switchover (effects distributed) facility |
---|---|---|---|
Standby system switchover facility | Y | Y | Y |
Standby-less system switchover (1:1) facility | Y | Y | N |
Standby-less system switchover (effects distributed) facility | Y | N | Y# |
All Rights Reserved. Copyright (C) 2011, 2015, Hitachi, Ltd.