Scalable Database Server, HiRDB Version 8 System Operation Guide
Table 25-45 shows how to check the operating status of units and servers when a system switchover facility is used.
Table 25-45 Checking the operating status of units and servers when a system switchover facility is used
| Command | System switchover facility | Output information |
|---|---|---|
| pdls -d svr | Standby system switchover facility |
|
| Standby-less system switchover (1:1) facility |
|
|
| Standby-less system switchover (effects distributed) facility |
|
Table 25-46 shows how to check the system status when a system switchover facility is used.
Table 25-46 Checking the system status when a system switchover facility is used
| Command | System switchover facility | Output information |
|---|---|---|
| pdls -d ha | Standby system switchover facility |
|
| Standby-less system switchover (1:1) facility |
|
|
| Standby-less system switchover (effects distributed) facility |
|
|
| monshow (only when HA monitor is used) | Standby system switchover facility |
|
| Standby-less system switchover (1:1) facility | ||
| Standby-less system switchover (effects distributed) facility | ||
| hateshow (only when Hitachi HA Toolkit Extension is used) | Standby system switchover facility |
|
| Standby-less system switchover (1:1) facility | ||
| Standby-less system switchover (effects distributed) facility |
Execute the pdls -d svr command on the system manager unit of the primary system.
All Rights Reserved. Copyright (C) 2007, Hitachi, Ltd.